top of page
Firefly_Gemini Flash_enhance the reference photo and make it editorial style with the same

GMM
HEADQUARTER

CLIENT

PT. Gaya Makmur Mobil (Corporate)

YEARS

2023 - 2025

LOCATION

Jakarta,

Indonesia

1_GMM.png
WhatsApp Image 2026-03-03 at 14.57.53 (2).jpg
WhatsApp Image 2026-03-03 at 14.57.56 - RSZ.jpg

The Early Stage

The objective of the project of
GMM Tower is to cater & house
their subsidiaries, a nationwide distributor
of trucks (FAW) and tractors (XCMG). 

On the first introduction, the client is somehow unsure and has no specific concept; the only request is to build a warehouse. After we did some early assessment, 3D developed the area to include an office building along with the warehouse.

WhatsApp Image 2026-03-03 at 14.57.57 (3) - RSZ.jpg
01_GMM - DSC08373 (4K square) (4)  - RSZ.jpg
01_GMM - DSC08373 (4K square) (7)-2  - RSZ.jpg
01_GMM - DSC08373 (4K square) (21)  - RSZ.jpg
01_GMM - DSC08373 (4K square) (15)  - RSZ.jpg

Masterplanning & Design

Independently, 3D decided to start with foundation feasibility studies, comprehending details of landsizing, and cost analysis from the initial stage, and possible development
in the future. Furthermore, we did comparison to their client’s headquarters in other countries 
FAW (Trucks) dan XCMG (Tractors).

01_GMM---DSC08373-(4K-square)-(17)---crop - RSZ.jpg
WhatsApp Image 2026-03-03 at 14.57.54 - RSZ.jpg
01_GMM - DSC08348 (4K square) (1)  - RSZ.jpg
01_GMM - DSC08373 (4K square) (24) - RSZ.jpg
GMM FACADE DRONE EDIT - RSZ_edited.jpg

Development Started

Upon agreement of making the masterplanning for the industrial & office complex, the green light to execute the project finally happened in 2023. 3D offered comprehnsive service encompassing complete feasibility studies and assistance on many pre-requisites management tasks and building procedurals, such as Building Construction Permits and Building Permits. 

Build Execution + Challenges

All through the process, some changes to architect drawing & design have resulted in many significant revision.

Through our in-depth research/ study, 3D team has already anticipate each possibility and every probability from the beginning.

What Makes The Project Works

By virtue of early preparation and through comprehensive calculation, our design & build method has proven to accommodate the project’s dynamic as anticipated. 

Through years of experience, we’re accustomed with adjustment and has constantly managed proper solutions. The reward came when the owners trusted us with creative freedom and budget transparency. As a result, 3D helped significantly increase the project’s value.

Summary

3D able to cater the project needs, exceeding limitations and our standard of excellence on creative, technical, safeties, cost-structure and non-technical points. We answer challenges by delivering an effective project’s outcome through high flexibility & cost-efficiency.

Upon delivery at the end of 2025, the owner shown appreciation of the build quality and assigned us with more further premium development on the projects.

WhatsApp Image 2026-03-03 at 14.57.55 (2) - crop - RSZ.jpg
01_GMM - DSC08373 (4K square) (5) - RSZ.jpg

SCOPE

Masterplanning

Architecture Design

Architecture Build

Interior Design

Interior Build

The Final Result

In 2025, beyond expectation, an established headquarter tower of
7 floors ready to accommodate the company with specific functions preceding the looks.

01_GMM - DSC08373 (4K square) (2)  - RSZ.jpg

CONTACT

admin@ddesigndevelopments.com

Kaimun Jaya 4 No. 38 Lebak Bulus, Cilandak, Jakarta Selatan, Indonesiaa

STAY CONNECTED

  • Instagram
  • Facebook
  • LinkedIn
  • X
bottom of page